The AquaTex pH system is built in a number of designs from 10 gpm through 1 MGD as packaged systems. These systems feature integrated microprocessor control centers with single and muli-probe designs. The units come in one, two, and three stage configurations depending on pH demands and discharge compliance restriction levels. All units feature optional remote monitoring, remote alarm signal, and full function alarm packages to ease the operator training requirements and minimize operator intervention on a day to day basis.
pH Neutralization Facility at the Gordon Biersch Brewing Company. San Jose, CA

Clarification & Sludge Storage at the Gordon Biersch Brewing Company. San Jose, CA

Treatment Train
(Typical Two Stage Unit)
  • Dual Pump Sump Pumping System
  • Initial Buffer Tank and Solids Separator (Tank 0)
  • Initial pH adjustment (Tank 1)
  • Polishing pH adjustment (Tank 2)
  • Digital Flume Final Flow Monitor

Client Customarily Provides
WRI Provides
  • Concrete Pad with containment wall (optional self contained units are available)
  • Compressed plant air to the treatment unit
  • Standard local telephone line to unit
  • Electrical power to run the plant - 50 amp , 480V, 3-phase
  • Necessary permits, shipping costs, and sales taxes
  • Design and engineering of the entire treatment train
  • The complete pH control system as described
  • Lift station and related hardware as described
  • Flume Flow monitor subsystem
  • Optional Installation of the specified system and related components
  • Operation and maintenance supervision of the facility for a 2 day training period